The Process

How we turn your
backyard into income.

A detailed walkthrough of every step — from the moment you submit your free assessment through to receiving ongoing lease income. We manage the complexity. You make the key decisions.

What We Do

Everything except the decision to proceed.

The five-step process covers assessment, design, approval, construction, and lease documentation. Buy My Backyard manages steps two through four entirely. You receive updates, make key decisions, and end up with a built secondary dwelling and a documented income stream.

No subdivision required
Every step in this process is designed to operate without requiring council approval to subdivide or sell land — the single biggest barrier for most Australian homeowners.
Start your free assessment →
01
Free · No commitment

Free Property Assessment

Submit your details through the assessment form on our website. We'll review your property — lot size, backyard configuration, council zone, setback requirements, and local planning rules — and advise you on whether your property qualifies for the Buy My Backyard programme.

The assessment is completely free. There is no fee at this stage, no obligation to proceed, and no pressure to make any decision. We'll contact you within 48 hours of receiving your submission with a clear recommendation.

What we assess:
  • Lot size and backyard dimensions
  • Local council zone and development controls
  • Setback requirements from boundaries and existing dwelling
  • Infrastructure availability (sewer, stormwater, power)
  • Council secondary dwelling policies for your specific suburb
  • State-specific planning legislation (SEPP, VCAT, etc.)
02
Managed by us

Design & Council Approvals

If your property qualifies, Buy My Backyard prepares an architectural design for the secondary dwelling — taking into account your backyard configuration, council requirements, and the intended rental outcome. You'll review and approve the design before anything is submitted to council.

We then prepare and lodge any required council approval — whether that's a Development Application (DA), a Complying Development Certificate (CDC), or another state-specific approval pathway. Many properties qualify for the faster CDC pathway, which significantly reduces the approval timeline.

Approval typeDA (Development Application) or CDC — determined by property zone
Typical CDC timeline2–6 weeks from lodgement
Typical DA timeline8–16 weeks — varies by council
Who manages thisBuy My Backyard — all paperwork, liaison, and responses
Your involvementDesign review and sign-off only
03
Fully managed build

Construction

Once approval is granted, Buy My Backyard manages the full construction of the secondary dwelling. You do not need to source a builder, manage contractors, coordinate inspections, or deal with the construction process in any way.

We work with our network of licensed builders and trades to deliver the dwelling to council specifications and to the quality standard required for a long-term leased secondary dwelling. You'll receive regular progress updates throughout the construction period and will be consulted on any key decisions that affect your property.

The build includes:
  • Slab or raised floor system as appropriate to your site
  • Full framing, external cladding, roofing
  • Internal fit-out to lettable standard (kitchen, bathroom, laundry)
  • Electrical and plumbing connections
  • Council inspections at all required stages
  • Occupation Certificate on completion
04
Legal documentation

99-Year Land Lease Issued

Following construction, a 99-year land lease is formally prepared, reviewed by all parties, and executed. The lease documents the specific portion of land being leased, the term, the rent, the rights and obligations of both parties, and any conditions applying to the land and dwelling.

You are strongly encouraged to have the lease reviewed by your own independent solicitor before signing. We will provide you with a draft for review well in advance of execution.

Your title is unchanged
A 99-year land lease creates a documented interest over a portion of your land — it does not transfer ownership, split your title, or affect your land title in the same way subdivision would. You remain the owner of your full property at all times.
Lease termUp to 99 years — as agreed between parties
Rent structureAgreed at lease execution — typically reviewed periodically
Your titleUnchanged — you own the land, the dwelling, and everything on it
RegisteredThe lease is registered appropriately to protect your interests
Legal adviceIndependent legal review strongly recommended and encouraged
05
The outcome

Ongoing Income

The tenant pays rent under the 99-year lease. You receive regular income from land that was previously sitting idle. The arrangement is legally documented, the income is structured, and the term is long — this is not a short-term rental situation.

The income generated is yours. Depending on the terms of the lease, the arrangement may also be passed on through your estate, creating a multi-generational income asset from land you already own.

Ready to find out what your backyard is worth?

The free assessment is the first step. No cost, no commitment — just a clear answer on whether your property qualifies.

Get my free assessment →

Timeline

What to expect, and when.

Every property and council is different — but this is a representative timeline for a standard metro property on the complying development pathway.

W0
Week 0 — Assessment submitted
You submit the free assessment form. We review your property address, lot configuration, and council zone. Response within 48 hours with a clear qualification recommendation.
W1
Week 1 — Introductory call & concept
We walk through the opportunity with you in a no-obligation call. Initial dwelling concept prepared showing placement, configuration, and approximate footprint. Questions answered.
W4
Weeks 2–4 — Design & documentation
Full architectural plans prepared. Council documentation and application assembled. You review and approve the design. Approval lodged with council (CDC or DA pathway).
W10
Weeks 4–10 — Approval received (CDC pathway)
CDC approval typically received within 2–6 weeks of lodgement. DA approval varies by council — typically 8–16 weeks. We manage all council queries and responses throughout.
W22
Weeks 10–22 — Construction
Construction typically takes 10–16 weeks for a standard granny flat. We manage all stages, inspections, and trades. You receive regular updates. Occupation Certificate issued on completion.
Week 22+ — Lease executed & income begins
Lease prepared, reviewed by both parties (and their legal advisers), and executed. Tenant moves in. You begin receiving regular lease income from land that previously earned nothing.

Eligibility

Do I qualify?

Many properties that homeowners assume won't qualify actually do. The free assessment is the definitive answer for your specific property — but here are the general markers that suggest a property is suitable.

  • You own the property. Freehold title or a long-term interest in the land. All Australian states and territories.
  • You have unused backyard space. Any standard suburban backyard may qualify — including smaller blocks. Exact dimensions are confirmed in the assessment.
  • You can't subdivide, or don't want to. If council rules block subdivision, or the cost makes it impractical, the land lease model may be the better path.
  • You want ongoing income, not a one-time sale. A 99-year land lease generates income over decades — structurally different to a capital event from a subdivision sale.
  • You're willing to have a secondary dwelling on your land. The build is managed entirely by us, but the dwelling is on your property — this needs to suit your circumstances.
Not sure if you qualify?
That's exactly what the free assessment is for. Submit your details and we'll review your specific property — lot size, zone, council rules, and backyard configuration — within 48 hours. No cost, no pressure.

Questions we're asked most.

What if the council won't approve a secondary dwelling?

We assess council requirements upfront and only proceed where approval is achievable. Some zones have a complying development pathway that bypasses the full DA process. We identify this at assessment.

Will this affect my mortgage?

A land lease does not require a change to your mortgage in the same way a subdivision sale would. We recommend disclosing the arrangement to your lender, and we can assist with this process.

Do I need to use my own savings to build?

The build structure is discussed during the assessment process. Several models are available — including arrangements where the build cost is structured against the lease income.

What if I already have a granny flat?

If you already have a secondary dwelling on your property, we may be able to help you structure a 99-year lease over that portion to formalise and generate ongoing income. Submit an assessment and note this in your enquiry.

Submit my free assessment →